Prime Electrical & Data Services

Supply chain emissions

Suppliers for the prefabricated electrical modules Prime builds for hyperscale data centres, with estimated annual emissions ranked highest to lowest. Physical-unit methods are used where material mass is known (cable, steel containment); spend-based EEIO factors are used elsewhere and flagged accordingly.

Assessed supplier emissions

24,702 t CO2-e

Scope 3 Category 1, per year

Annual procurement covered

$83.3M

Materials & equipment spend

Share of Prime's total footprint

≈ 85%

Scope 3 dominates the inventory

Ranked supplier inventory

RankSupplierWhat they supplyAnnual volumeMethod & factort CO2-e / yr% of top 10Data qualityActions
1
Schneider Electric Australia
MV/LV switchgear, busway & prefabricated power skids
Prefabricated power skids, MV ring main units, LV switchboards, EcoStruxure busway, Galaxy UPS and PDU equipment for prefabricated data hall modules.~46 prefabricated power skid assemblies, 1,300 m busway, 38 LV switchboards
$14.5M spend
spend based
0.3 kg CO2-e/AUD
EEIO factor – electrical equipment manufacturing (AUD, 2024 basis)
4,35017.6%medium
2
Prysmian Australia (Olex)
LV/MV power cable & copper conductor
XLPE LV and MV power cable, busbar trunking cable, copper and aluminium conductor for data hall reticulation and generator feeders.~1,150 tonnes of copper-based cable delivered annually
$12.8M spend
physical
3200 kg CO2-e/tonne
Copper cable cradle-to-gate intensity, ICA/industry EPD average (3.2 t CO2-e per tonne)
3,68014.9%high
3
Cummins South Pacific
Standby diesel generation
2.0–2.75 MVA standby diesel generator sets, enclosures, fuel systems and controls for critical power on prefabricated data centre builds.~34 generator sets (approx. 78 MVA installed capacity)
$11.8M spend
spend based
0.28 kg CO2-e/AUD
EEIO factor – engine and generator manufacturing (AUD, 2024 basis)
3,30413.4%medium
4
ABB Australia
MV switchgear, transformers & drives
MV primary switchgear, dry-type and cast-resin transformers, protection relays and variable speed drives for cooling plant.~28 MV switchboard sections, 22 transformers, protection and drive packages
$9.2M spend
spend based
0.32 kg CO2-e/AUD
EEIO factor – heavy electrical equipment manufacturing (AUD, 2024 basis)
2,94411.9%medium
5
Vertiv Australia
UPS, PDU & prefabricated power/cooling modules
Modular UPS systems, rack PDUs, thermal management units and prefabricated power modules for data hall fitout.~26 UPS modules and 14 prefabricated power/cooling modules
$7.6M spend
spend based
0.3 kg CO2-e/AUD
EEIO factor – electrical equipment manufacturing (AUD, 2024 basis)
2,2809.2%medium
6
NHP Electrical Engineering Products
Switchboard components & distribution
Switchboard build components, circuit protection, metering, enclosures and control gear used in Prime's own prefabricated assemblies.Components for ~120 distribution and control boards built in-house
$8.1M spend
spend based
0.26 kg CO2-e/AUD
EEIO factor – electrical component wholesale/manufacture (AUD, 2024 basis)
2,1068.5%low
7
Eaton Industries Australia
LV switchboards & UPS
LV distribution switchboards, busway, UPS systems and metering for data hall and support building electrical.~31 LV boards and associated UPS/metering equipment
$6.4M spend
spend based
0.3 kg CO2-e/AUD
EEIO factor – electrical equipment manufacturing (AUD, 2024 basis)
1,9207.8%medium
8
Wilson Transformer Company
Distribution transformers (Australian manufactured)
Oil-filled and cast-resin distribution transformers manufactured in Wodonga VIC for data centre substations.~24 distribution transformers (approx. 62 MVA)
$5.2M spend
spend based
0.3 kg CO2-e/AUD
EEIO factor – heavy electrical equipment manufacturing (AUD, 2024 basis)
1,5606.3%medium
9
Legrand Australia (Cablofil)
Cable containment & tray systems
Galvanised steel cable tray, ladder, basket and containment systems, plus wiring accessories for prefabricated modules.~620 tonnes of galvanised steel containment
$4.1M spend
physical
2500 kg CO2-e/tonne
Galvanised steel section cradle-to-gate intensity, worldsteel/EPD average (2.5 t CO2-e per tonne)
1,5506.3%high
10
CommScope Australia
Structured cabling & fibre
Fibre trunk assemblies, Cat6A copper structured cabling, patch panels and racks for data hall interconnect.~980 fibre trunks and 42 km structured cabling
$3.6M spend
spend based
0.28 kg CO2-e/AUD
EEIO factor – communications equipment manufacturing (AUD, 2024 basis)
1,0084.1%medium
Total — all assessed suppliers (Scope 3 Category 1)24,702100%

Reduction opportunities by supplier

Schneider Electric Australia

4,350 t

Specify SF6-free MV switchgear and request EPD-backed low-carbon variants; consolidate skid designs to reduce steel and copper mass.

Supplier commitment: Net zero across value chain by 2050; SBTi validated targets; publishes EPDs for most switchgear ranges

Prysmian Australia (Olex)

3,680 t

Switch suitable feeders from copper to aluminium, optimise cable schedules to cut over-length waste, and return drums and offcuts to closed-loop copper recycling.

Supplier commitment: SBTi validated 1.5°C target; publishes cable EPDs

Cummins South Pacific

3,304 t

Specify HVO-compatible gensets and commissioning on renewable diesel to cut commissioning-stage Scope 1 and client Scope 3.

Supplier commitment: Destination Zero strategy; 2030 facility emissions targets; HVO-capable engines available

ABB Australia

2,944 t

Prefer amorphous-core and high-efficiency transformers, and request EPDs at tender stage rather than post-award.

Supplier commitment: Carbon neutral own operations by 2030; SBTi validated; EcoSolutions labelled product range

Vertiv Australia

2,280 t

Select lithium-ion over VRLA where cycle life justifies it, and specify high-efficiency eco-mode UPS to cut client operational emissions.

Supplier commitment: Science-based targets set for Scope 1, 2 and 3; efficiency-rated product portfolio

NHP Electrical Engineering Products

2,106 t

Request supplier-specific emissions data to replace spend-based estimates — currently the lowest data quality in the inventory.

Supplier commitment: Australian distributor; sustainability reporting emerging, limited product-level carbon data

Eaton Industries Australia

1,920 t

Standardise board designs across projects to reduce copper busbar and sheet steel mass per MW delivered.

Supplier commitment: SBTi validated near-term targets; carbon neutral operations target 2030

Wilson Transformer Company

1,560 t

Leverage local manufacture in tender responses (lower upstream transport) and request measured factory energy data for a supplier-specific factor.

Supplier commitment: Australian manufacturer; local supply shortens freight leg materially versus imported units

Legrand Australia (Cablofil)

1,550 t

Specify high recycled-content or EAF-route steel containment — a shift to EAF steel could cut this line by roughly 40%.

Supplier commitment: SBTi validated targets; extensive EPD library across containment range

CommScope Australia

1,008 t

Pre-terminated factory assemblies reduce on-site offcut waste; request product carbon footprints for major SKUs.

Supplier commitment: SBTi validated near-term targets; product carbon footprint data available on request

How these numbers were produced

  • Supplier identities reflect the major electrical equipment manufacturers and distributors actually used for prefabricated data centre power and data infrastructure in Australia.
  • Annual volumes and spend are modelled estimates based on Prime's project mix (Vantage Tullamarine 64MW, AWS 063/064, MEL07) and typical equipment content per MW of critical load. They are not extracted from Prime's accounts payable ledger.
  • Cable and containment use physical cradle-to-gate intensities (3.2 t CO2-e per tonne copper cable; 2.5 t CO2-e per tonne galvanised steel). Remaining categories use spend-based EEIO factors of 0.26–0.32 kg CO2-e per AUD.
  • Spend-based estimates carry ±40% uncertainty. Replacing them with supplier-specific Environmental Product Declarations is the single highest-value data improvement available.
  • Supplier climate commitments listed are publicly stated positions and should be re-verified before being quoted in a tender submission.